Station alignment
Review track layout, vehicle positioning, access points and the clearance needed for the platform and cleaning equipment.
03 / Rail logistics systems
An automated cleaning scope that brings together rail tank-car access, interior cleaning, drying, inspection and recovery interfaces.

Project fit
Rail projects require the cleaning system to be reviewed in the context of track position, vehicle geometry, operating controls and the working station.
Review track layout, vehicle positioning, access points and the clearance needed for the platform and cleaning equipment.
Confirm tank geometry, manway or access location, previous cargo and the intended cleaning result.
Select the cleaning-head arrangement, cleaning medium, programmed movement and verification procedure for the project.
Coordinate wastewater, exhaust, utilities and required safeguards with the final rail-cleaning station layout.
Station workflow
The final procedure is determined by the selected tank car, residue, site operating rules and applicable safeguards.
Bring the rail tank car into the cleaning position and confirm the agreed station controls.
Manage residue, establish safe access and prepare the selected cleaning connection.
Run the selected interior-cleaning sequence and direct process streams to the defined interfaces.
Complete drying and project-defined inspection before returning the rail tank car to service.
Integrated station scope
Equipment, utilities, access, controls and recovery interfaces are selected together for the final rail project.
Platforms, support structure, selected cleaning-head movement and the rail-car access arrangement.
Project-defined cleaning medium, 3D cleaning action and selected drying requirements.
Operating controls, collection routes and site treatment connections defined for the station.
Discuss your rail project
JAGUI will coordinate the next project discussion around the complete rail-cleaning context.